Since its establishment in 1996, the Firm has undertaken numerous projects, with the volume of work increasing over the years. The listings given in this section do not show all jobs completed, but are selected to demonstrate the range of types of work undertaken by the Firm, and listed in four different categories based on the type of services (Soil Investigation, Materials Testing, Survey, Environmental Research). |
|
|
| 1. SOIL TESTING |
| 1.1 SOIL INVESTIGATION |
PROJECT |
SCOPE OF WORK
|
| |
Soil Investigation for PMP Zero Discharge Treatment of Filter Backwash & Tank Desanding Water Disposal streams located at pressure maintenance plant at Wafra main gathering center. |
|
|
| |
5 Boreholes drilled down to 10.0m depth, soil classification, Laboratory testing and submitting Report. |
|
|
| CLIENT |
START |
END |
|
|
|
|
|
|
1.2 CORE PENETRATION TESTING (CPT) |
PROJECT |
SCOPE OF WORK
|
| |
Electrical Cone penetration Tests (CPT) for Motor Rewinding Repair Factory at Amghara Area. |
|
|
| |
2 Cone Penetration Tests were conducted and submitted reports. |
|
|
| CLIENT |
START |
END |
| |
Marafie Construction Company
For Gulf Paramount Services Ltd.
|
|
|
|
|
|
|
| |
|
| 1.3 ELECTRICAL RESISTIVITY TESTING |
|
PROJECT |
SCOPE OF WORK
|
| |
Soil Electrical Resistivity for ESP For FCC Unit at Mina Ahmadi. |
|
|
| |
Soil Electrical Resistivity Test.
|
|
|
| CLIENT |
START |
END |
| |
Alghanim Int'l. Gen.Trad. & Cont. Co. for KNPC |
|
|
|
|
|
|
| |
|
| 2. MATERIALS TESTING |
|
| 2.1 TURNKEY MATERIALS TESTING PROJECTS |
|
PROJECT |
SCOPE OF WORK
|
| |
Rock Core Testing for KOC Crude Export Facilities at North Pier. |
|
|
| |
Coring of rock samples, laboratory testing: unconfined compression test, brazilian tensile strength, point load test, calcium carbonate content.
|
|
|
| CLIENT |
START |
END |
| |
Boskalis Westminster Middle East Ltd. |
|
|
|
|
|
|
| |
|
| 2.2 FIELD SOIL COMPACTION TESTING |
|
PROJECT |
SCOPE OF WORK
|
| |
KOC – FMP Project in Burgan.
|
|
|
| |
Field soil density testing using cone method.
|
|
|
| CLIENT |
START |
END |
| |
Nasser M Al-Baddah Trading & Cont. Co. |
|
|
|
|
|
|
| |
|
| 2.3 FIELD CONCRETE INSPECTION |
|
PROJECT |
SCOPE OF WORK
|
| |
Water Distribution Complex at Subiya/ Subiya WDC-C1, Project / Contract No. MEW/NCC/2859-2002-
2003.
|
|
|
| |
Estimating the Crack Depth of Concrete by Ultrasonic Method.
|
|
|
| CLIENT |
START |
END |
| |
China Gezhouba Construction Group Corporation. |
|
|
|
|
|
|
| |
|
| 3. SURVEY |
|
PROJECT |
SCOPE OF WORK
|
|
| |
Carry out a survey of the stockpiles at their yard at Mina Abdullah.
|
|
|
| CLIENT |
START |
END |
|
|
|
|
|
| |
|
| 4. ENVIRONMENTAL RESEARCH |
|
PROJECT |
SCOPE OF WORK
|
| |
Drilling Production Well for Collecting Water Samples and Detection of Hydrogen Sulphide (H2S) Concentrations for various Project in Kuwait City.
|
|
|
| |
Drilling and Installation of water well to 30 m depth for the purpose of collecting ground water samples for H2S detection.
|
|
|
| CLIENT |
START |
END |
|
|
|
|
|
More references are available upon request |
|